| Mr. Mallonee's Home Page |
 |
|
|
Welcome to Mr. Mallonee's Web Site! Information pertinent to Introduction to Engineering and Technology Concepts can be found here. If there are any questions about the course, grades, and projects please don't hesitate to contact me via the contact information tab at left.
Problem Solving Model: 1. Identify the Problem 2. Research and Identify all possible solutions (brainstorm) 3. Form a plan of action 4. Activate the plan 5. Reflect on the plan (summarize results)
Current Calendar October 2 - Inventor Power Point due at the end of class October 6 - Linoleum Tile (5 points) October 7 - Base Plate (10 points) October 8 - Shim (10 points) October 9 - Sheet Metal Stamp (10 points) October 12 - Adjusting Arm (10 points) October 13 - Chapter 3 - Types of Technological Systems (20 points) October 14 - Lacrosse Field (EXTRA CREDIT!) October 15 - Gasket (10 points)Packet #5 due today in class October 16 - MSTA Conference - School Closed for Students October 21 - Conveyor Link (10 points) October 23 - Sketch Sheet #1 due (20 points) October 26 - Sketch Sheet #2 due (20 points) October 27 - Sketch Sheet #3 due (20 points) October 27 - Packet #6 due (100 points) October 28 - Sketch Sheet #4 BEGINS ONLY October 29 - Sketch Sheet #4 due (20 points) October 30 - Inventor Presentations November 2 - Sketch Sheet #5 due (20 points) November 3 - Chapter 4 - Inputs to Technological Systems November 3 - ALL MAKEUP WORK DUE November 4 - Bearing Cap FINAL Drawing Begins November 5 - Bearing Cap FINAL drawing due (20 points) Packet #7 Due November 5 - End of First Quarter November 6 - Assessment Day - School Closed for Students November 9 - T-Squares and Triangles November 10 - Inlaid Linoleum Design November 11 - Base Plate November 12 - Notch Block, Packet #8 Due November 13 - Isometric Drawings November 16 - Notch Block Isometric November 17 - Nonsense Block Isometric, Packet #9 Due |